WHIRLPOOL

Coordination was key

This project was carried out simultaneously with the refurbishment of ESB Head Office and included the fast-track installation of the heating and cooling systems, air conditioning, natural gas system, waste water system and more.

As the work was carried out in three separate buildings, we had to carefully coordinate three separate teams and facing three times as many challenges.

Year
2017

Size
1,500 m2

SCOPE OF INSTALLATION WORKS

Heat Recovery Ventilation System
AHU Ventilation System
Mechanical Ventilation System
Comms Air Conditioning System
Kitchen Ventilation System
Natural Gas System
Gas Detection System
Gas Proving System
Central Heating Plant
Fan Coil Unit Heating Plant

Fan Coil Unit Cooling Plant
Water Services System
Waste Water System
BMS System
Dry Riser System
Fire Extinguishers
Ansul Gas Fire Suppression System
Water Sampling and Testing
Water Treatment
Water Disinfection

PARTNERS

Jones LaSalle Limited
Collen Construction