WHIRLPOOL
Coordination was key
This project was carried out simultaneously with the refurbishment of ESB Head Office and included the fast-track installation of the heating and cooling systems, air conditioning, natural gas system, waste water system and more.
As the work was carried out in three separate buildings, we had to carefully coordinate three separate teams and facing three times as many challenges.
Year
2017
Size
1,500 m2