MERRION HOTEL

5-star fit-out at 5-star Dublin hotel

The Merrion Hotel is popular with visiting dignitaries, VIPs and those who enjoy sumptuous levels of luxury. Even this comprehensive fit-out was no excuse for dropping standards.

Adopting the motto ‘do not disturb’, we set up a temporary kitchen for the Michelin-starred chef and his team, and scheduled the loudest work for the times when the hotel was at its quietest. And the result? Nobody noticed we were there.

Year
2018

Size
10,000 m2

SCOPE OF INSTALLATION WORKS

Heat Recovery Ventilation System
AHU Ventilation System
Mechanical Ventilation System
Comms Air Conditioning Installation
Kitchen Ventilation System
Rainwater Harvesting Installation
Natural Gas Installation
Gas Detection System
Gas Proving System
Central Heating Plant
District Heating System
Underfloor Heating System
Trench Heating Installation

Fan Coil Unit Cooling
Water Services Installation
Waste Water Installation
BMS Installation
Central Vacuum Installation
Watermist Sprinkler System
Smart Scan Spray System
Motorised Fire Damper System
Smoke Exhaust System
Dry Riser Installation
Fire Extinguisher Installation

PARTNERS

John Paul Construction
Homan O’Brien Associates
Kavanagh Tuite Architects
Linesight QS

Call Now Button