DEANCREST OIL STORAGE TERMINAL, DUNDALK, LOUTH
Project Overview
- McKeon bros were selected to carry out the welding of new floor plates, tanks nozzles and skirt welding to three no. steel tanks.
- The work scope was prepared by an independent x ray company.
- All tanks were drained down gas freed and inspected. The necessary equipment was provided for working in confined space areas with the necessary continuous gas monitors in place.
- New connections to tanks fitted with valves and pipelines to new bottom loading facility.
Standards / Certification
- All welding work x rayed to EEMUA159 on completion.