DEANCREST OIL STORAGE TERMINAL, DUNDALK, LOUTH

Project Overview​

​

  • McKeon bros were selected to carry out the welding of new floor plates, tanks nozzles and skirt welding to three no. steel tanks.​
  • The work scope was prepared by an independent x ray company.​
  • All tanks were drained down gas freed and inspected. The necessary equipment was provided for working in confined space areas with the necessary continuous gas monitors in place.​
  • ​New connections to tanks fitted with valves and pipelines to new bottom​ loading facility.​

​

​

Standards / Certification​

  • All welding work x rayed to EEMUA159 on completion.

SCOPE OF INSTALLATION WORKS

AHU Ventilation System
Mechanical Ventilation System
Comms Air Conditioning Installation
Natural Gas Installation
Gas Detection System
Central Heating Plant

Fan Coil Unit Heating
Central Chiller Plant
Water Services Installation
Waste Water Installation
BMS Installation
Fire Extinguisher Installation