BELFIELD PAVILLION

Fitting 48 showers – with added pressure

When our client turned to us for the mechanical fit-out of two large shower blocks at the Belfield Office Park, we really turned it on.

Despite the significant disruptions caused by Covid-19, this complex project ran smoothly – thanks to our knowledge of building from BIM, local connections to contractors and suppliers and our expertise in gas-fired water heating, boosted cold water services, gas detection and heat recovery ventilation systems.

Year
2021

Size
380 m2

SCOPE OF INSTALLATION WORKS

Gas fired water heaters
Gas detection system
HRV ventilation
Passive fire duct installation
Natural gas installation
Storm water network
Sump pump drainage
Water services installation
Fire smoke damper installation